Tender Title | Final Location Survey For Psr Removal By Realignment Of Curve Of 1.4 Degree And Sharper In Ddu Division Under Sr.den/iii/ddu. | ||
Tender ID | NA | Tender Reference Number | 09-DDU-SRDEN-III-24-25 |
Tender Type | Open/advertised | ||
Tender Opening Date | 2024-10-05 08:15 AM | Tender Closing Date | 2024-10-31 06:30 AM |
Tender Value | Refer Document | Tender Location | Hazipur , Vaishali , Bihar |
Tender Category | Goods | Product Category | Civil Works Others Tenders |
ePublished Date | 2024-10-05 08:15 AM | Bid Opening Date | 2024-10-31 06:30 AM |
Document Download Start Date | 2024-10-05 08:15 AM | Document Download End Date | 2024-10-31 06:30 AM |
Bid Submission Start Date | 2024-10-05 08:15 AM | Bid Submission End Date | 2024-10-31 06:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | NA |
Tender Fee | Refer document |
EMD (Earnest Money Deposit) | ₹ 14,400 |
EMD Fee Type | NA |
Payment Instruments/Mode | NA |
Work Description - For Complete Deion And Other Details, Please Refer To Tender
The Ministry of Railways, DDU Division-Engineering/East Central Railway, invites tenders for "Final Location Survey for PSR removal by realignment of Curve of 1.4 degree and Sharper in DDU Division under Sr.DEN/III/DDU" (Tender Reference Number: 09-DDU-SRDEN-III-24-25). This open tender, categorized as Goods under Railway related Products, requires a survey related to the realignment of a railway curve in Hazipur. The tender document is available for download from October 5th, 2024, at 1:45 PM until October 31st, 2024, at 12:00 PM. Bid submission follows the same timeframe. The earnest money deposit (EMD) is ₹14,400, and there is no tender fee. The tender will be opened on October 31st, 2024, at 12:00 PM at the DRM Office, 2nd floor, Pt. DDU Nagar. For complete details, please refer to the tender document.
Get Hassle free financing for your business
Office Inviting Bids | Ddu Division-engineering/east Central Rly |
Address | Drm Office 2nd Floor Pt. Ddu Nagar |
Contact Details | NA |
NA | |
Website | NA |
Final Location Survey For Debottling Of Bottelneck In Ddu Yard For..read more
Ohe Modification Works In Connection With Removal Of Tsr/psr In 3rd..read more
Rate Contract For Carrying Out Final Location Survey ( Geotechnical Stus,..read more
Conducting Final Location Survey, Including Collection Of Field Details For Geotechnical..read more
Complete Track Renewal (ctr/p)=11.246 Tkm. & Through Sleeper Renewal (tsr/p) =26.350..read more
All the major brands in each raw material category