Creation Of 250 Kva S/stn Along With Ht/lt Line For Water Supply Scheme Bakkal Under Deposit Contribution Works Of Railways On Turnkey Basis
Tender Title | Creation Of 250 Kva S/stn Along With Ht/lt Line For Water Supply Scheme Bakkal Under Deposit Contribution Works Of Railways On Turnkey Basis | ||
Tender ID | 2024_PDD_269230_1 | Tender Reference Number | eNIT32of20242025Dated30122024 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-12-31 08:30 AM | Tender Closing Date | 2025-01-10 11:00 AM |
Tender Value | ₹ 18 L | Tender Location | Bakkal Reasi , Reasi , Jammu And Kashmir |
Tender Category | Works | Product Category | Civil Works Others Tenders, Electrical Generators And Transformers Tenders, Water Storage And Supply Tenders |
ePublished Date | 2024-12-31 03:30 AM | Bid Opening Date | 2025-01-11 09:00 AM |
Document Download Start Date | 2024-12-31 08:30 AM | Document Download End Date | 2025-01-10 11:00 AM |
Bid Submission Start Date | 2024-12-31 08:30 AM | Bid Submission End Date | 2025-01-10 11:00 AM |
Clarification start Date | 2024-12-31 08:30 AM | Clarification End Date | 2025-01-10 08:30 AM |
Bid Validity Period (in Days) | 180 |
Tender Fee | ₹ 1000 |
EMD (Earnest Money Deposit) | ₹ 36,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Offline |
Work Description - For Creation Of 250 Kva S/stn Along With Ht/lt Line For Water Supply Scheme Bakkal Under Deposit Contribution Works Of Railways On Turnkey Basis
The Executive Engineer ED JPDCL Reasi invites open tenders (eNIT32of20242025Dated30122024) for a turnkey project: the creation of a 250 KVA substation with accompanying HT/LT lines for the Bakkal Water Supply Scheme, Reasi (Pincode 182311). This project, valued at ₹18,00,000, is under the Deposit Contribution Works of Railways and falls under the DC-PDD's jurisdiction. The tender documents are available for download from December 31st, 2024, 2:00 PM to January 10th, 2025, 4:30 PM, with a tender fee of ₹1000 and an EMD of ₹36,000 payable to the Executive Engineer ED Reasi. Bid submission closes January 10th, 2025, 4:30 PM, with opening scheduled for January 11th, 2025, 2:30 PM at the Office of Executive Engineer ED Reasi. The project requires completion within 45 days, and bids are valid for 180 days. Interested A Class Electrical Contractors must submit a complete application including technical and financial bids, adhering strictly to the specified guidelines detailed in the tender documents.
Get Hassle free financing for your business
Office Inviting Bids | Executive Engineer Ed Jpdcl Reasi |
Address | Office Of Executive Engineer Electric District Complex Reasi |
Contact Details | NA |
NA | |
Website | NA |
Creation Of 100 Kva Substation Along With Ht Line And Underground..read more
Pl Refer Sbd..read more
For The Work Of Issuing 550 Kva New Connection (site C.w.u.r.)..read more
Malappuram Package No.6 - Construction Of 11 Kv Line Using Ht..read more
Construction Of Ht/lt Line And 11/0.4 Kv S/s For Dhakuri Chiltha..read more
All the major brands in each raw material category