Installation Of 63 Kv Transformer On Going Work Completed Lt /ht Lance New Fund Alloted Dt 2.18 Lacs Cost Of Work 63 Kva Transformer Lachipora Chakipora Ward No 03 Under Ddc Grants 2024 25
Tender Title | Installation Of 63 Kv Transformer On Going Work Completed Lt /ht Lance New Fund Alloted Dt 2.18 Lacs Cost Of Work 63 Kva Transformer Lachipora Chakipora Ward No 03 Under Ddc Grants 2024 25 | ||
Tender ID | 2025_PDD_269721_1 | Tender Reference Number | EDB/118 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-08 10:30 AM | Tender Closing Date | 2025-01-30 08:30 AM |
Tender Value | ₹ 2.10 L | Tender Location | Installation Of 63 Kv Transformer On Going Work Co , Baramulla , Jammu And Kashmir |
Tender Category | Works | Product Category | Electrical Generators And Transformers Tenders, Electrical Works Tenders |
ePublished Date | 2025-01-07 10:30 AM | Bid Opening Date | 2025-02-01 08:30 AM |
Document Download Start Date | 2025-01-07 10:30 AM | Document Download End Date | 2025-01-30 08:30 AM |
Bid Submission Start Date | 2025-01-08 10:30 AM | Bid Submission End Date | 2025-01-30 08:30 AM |
Clarification start Date | 2025-01-07 10:30 AM | Clarification End Date | 2025-01-08 10:30 AM |
Bid Validity Period (in Days) | 180 |
Tender Fee | ₹ 239 |
EMD (Earnest Money Deposit) | ₹ 4,200 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Offline |
Work Description - Installation Of 63 Kv Transformer On Going Work Completed Lt /ht Lance New Fund Alloted Dt 2.18 Lacs Cost Of Work 63 Kva Transformer Lachipora Chakipora Ward No 03 Under Ddc Grants 2024-25
The Executive Engineer ED Baramulla invites open tenders for the installation of a 63 KVA transformer in Lachipora Chakipora, Ward No. 03, under DDC grants 2024-25. This project, with a tender value of ₹210,000, involves completing ongoing work on LT/HT lines and utilizes newly allocated funds (₹2.18 lacs). The tender (ID: 2025_PDD_269721_1, Ref No: EDB/118) requires a fixed EMD of ₹4,200 (EMD exemption allowed), and a tender fee of ₹239 (exemption allowed). Documents are available for download from January 7th, 2025, 4:00 PM to January 30th, 2025, 2:00 PM. Bids must be submitted from January 8th, 2025, 4:00 PM to January 30th, 2025, 2:00 PM, with opening scheduled for February 1st, 2025, at 2:00 PM at the Executive Engineer ED Baramulla office. This is a turnkey contract with a 15-day work period and 180-day bid validity. Interested parties should refer to the tender documents for detailed specifications and submission requirements.
Get Hassle free financing for your business
Office Inviting Bids | Executive Engineer Ed Baramulla |
Address | Executive Engineer Ed Baramulla |
Contact Details | NA |
NA | |
Website | NA |
Installation Of New 63 Kva Sub-station At Brajalalchak..read more
Installation Of New 63 Kva Sub-station At Brajalalchak..read more
Work Of Xlpe Cable For Transferring The Power Of 33 Kv..read more
Earthing Work Of 25, 63 And 100 Kva Distribution Transformer In..read more
Constructing 1000m Ht/lt By Using Covered Conductor, Erecting 100 
 Kva..read more
All the major brands in each raw material category