Resurfacing Of Bhatkala Soraba Road From Km 74.32 To 84.32 In Sagara Taluk, Shivamogga District ( Job No.crif Knt 2023 24 176)
Tender Title | Resurfacing Of Bhatkala Soraba Road From Km 74.32 To 84.32 In Sagara Taluk, Shivamogga District ( Job No.crif Knt 2023 24 176) | ||
Tender ID | 2024_MoRTH_828282_1 | Tender Reference Number | EE/NHD/SMG/AE1/CRIF/2024/963 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-09-27 12:30 PM | Tender Closing Date | 2024-10-28 10:30 AM |
Tender Value | Refer Document | Tender Location | Sagara , Shivamogga , Karnataka |
Tender Category | Works | Product Category | Road Construction Tenders |
ePublished Date | 2024-09-27 12:30 PM | Bid Opening Date | 2024-10-29 11:00 AM |
Document Download Start Date | 2024-09-27 12:30 PM | Document Download End Date | 2024-10-28 10:30 AM |
Bid Submission Start Date | 2024-09-27 12:30 PM | Bid Submission End Date | 2024-10-28 10:30 AM |
Clarification start Date | 2024-09-27 12:30 PM | Clarification End Date | 2024-10-18 12:30 PM |
Bid Validity Period (in Days) | 135 |
Tender Fee | ₹ 5900 |
EMD (Earnest Money Deposit) | ₹ 7,28,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Offline |
Work Description - Resurfacing Of Bhatkala Soraba Road From Km 74.32 To 84.32 In Sagara Taluk, Shivamogga District ( Job No.crif-knt-2023-24-176)
The Ministry of Road Transport and Highways is inviting bids for the resurfacing of the Bhatkala Soraba road, spanning from kilometer 74.32 to 84.32 in Sagara Taluk, Shivamogga District (Job No. CRIF-KNT-2023-24-176). The project, categorized as a civil works tender, is an open tender with a tender reference number of EE/NHD/SMG/AE1/CRIF/2024/963. The tender process commences on September 27, 2024, with the submission of bids concluding on October 28, 2024, at 4:00 PM. Prospective bidders are required to submit a fixed EMD amount of INR 7,28,000 to the Executive Engineer, NH Division, Shivamogga, by the deadline. Additionally, a tender fee of INR 5,900 must be paid to Bharathkosh. The bid opening is scheduled for October 29, 2024, at 4:30 PM in Shivamogga. The contract duration for the project is 180 days.
Get Hassle free financing for your business
Office Inviting Bids | Executive Engineer, Nh Division, Shivamogga |
Address | Ee Nh Division, Shivamogga |
Contact Details | NA |
NA | |
Website | NA |
Resurfacing Of Kuppalli Kavishaila Sh.148 Road Gama Mallenahalli Via Hirekeru Road..read more
Reasphalting To Road From Kumata-kadamadagi Sh48 Siddpura Soraba Via Shikaripura Road..read more
Resurfacing To Bagalakote - Biligiriranganabetta Road (sh-57) From Ch.316.50 To 320.40..read more
Resurfacing Ganjendragada-soraba Sh-136 Road From Km216.865 To 226.07 In Haveri Taluk..read more
Resurfacing To Ranebennur Medleri From Km 0.00 To 2.00 In Ranebennur..read more
All the major brands in each raw material category