General Kip Lb Rectification Rectification Of Kulakkada Branch Canal From Ch 11900m To 12483m In Kottarakkara Constituency General Civil Work
Tender Title | General Kip Lb Rectification Rectification Of Kulakkada Branch Canal From Ch 11900m To 12483m In Kottarakkara Constituency General Civil Work | ||
Tender ID | 2024_Irrig_718441_1 | Tender Reference Number | IRR/PII/TR/5543/2022_5_10_8/1 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-12-20 12:30 PM | Tender Closing Date | 2024-12-28 12:30 PM |
Tender Value | ₹ 7.33 L | Tender Location | Mavady , Kollam , Kerala |
Tender Category | Works | Product Category | Civil Works Others Tenders, Irrigation Work Tenders |
ePublished Date | 2024-12-20 12:30 PM | Bid Opening Date | 2024-12-31 06:15 AM |
Document Download Start Date | 2024-12-20 12:30 PM | Document Download End Date | 2024-12-28 12:30 PM |
Bid Submission Start Date | 2024-12-20 12:30 PM | Bid Submission End Date | 2024-12-28 12:30 PM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 60 |
Tender Fee | ₹ 1620 |
EMD (Earnest Money Deposit) | ₹ 18,325 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - General Kip Lb Rectification Rectification&#x0d Of Kulakkada Branch Canal From Ch 11900m&#x0d To 12483m In Kottarakkara Constituency&#x0d General Civil Work&#x0d
The Irrigation Department, a State Government authority, invites open tenders (Tender ID: 2024_Irrig_718441_1, Reference No: IRR/PII/TR/5543/2022_5_10_8/1) for the rectification of the Kulakkada Branch Canal (Ch 11900m to 12483m, Kottarakkara Constituency). This General Civil Work project, valued at ₹7,32,995, demands a fixed EMD of ₹18,325 and a tender fee of ₹1,620. The Assistant Executive Engineer, KIP LB Subdivision No 13 Kollam, is the tendering authority. Tender documents are available for download from December 20th, 2024, 6:00 PM to December 28th, 2024, 6:00 PM. Bids must be submitted online by December 28th, 2024, 6:00 PM, with opening scheduled for December 31st, 2024, 11:45 AM at KIP LB Subdivision No 13 Kollam. The project involves a 365-day work period and a 60-day bid validity. Interested bidders should refer to the tender documents for detailed specifications and submission requirements.
Get Hassle free financing for your business
Office Inviting Bids | Assistant Executive Engineer |
Address | Assistant Executive Engineer&#x0d Kip Lb Subdivision No 13 Kollam |
Contact Details | NA |
NA | |
Website | NA |
General Kip Lb Rectification Urgent
 Rectification Of Kulakkada Branch Canal From
..read more
General Kip Lb Rectification Work
 Rectification Of Koottikkada Distributary Canal
 Between..read more
General Kip Rb Urgent Rectification
 Works From Ch 700m Of Muthupilakkad
..read more
General Kip Rb Urgent Rectification
 Works To Arrest Heavy Seepage Near..read more
General Kip Rb Urgent Rectification
 Works To Arrest Heavy Seepage Near..read more
All the major brands in each raw material category