General Kip Lb Rectification Urgent Rectification Of Kulakkada Branch Canal From Ch 16400m To 16700m In Kottarakka Constituency General Civil Work
Tender Title | General Kip Lb Rectification Urgent Rectification Of Kulakkada Branch Canal From Ch 16400m To 16700m In Kottarakka Constituency General Civil Work | ||
Tender ID | 2024_Irrig_718370_2 | Tender Reference Number | IRR/PII/TR/5543/2022_5_12_10/1 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-01 11:30 AM | Tender Closing Date | 2025-01-09 11:30 AM |
Tender Value | ₹ 7.49 L | Tender Location | Mavady , Kollam , Kerala |
Tender Category | Works | Product Category | Civil And Construction Tenders, Civil Works Others Tenders, Irrigation Work Tenders |
ePublished Date | 2025-01-01 11:30 AM | Bid Opening Date | 2025-01-13 05:30 AM |
Document Download Start Date | 2025-01-01 11:30 AM | Document Download End Date | 2025-01-09 11:30 AM |
Bid Submission Start Date | 2025-01-01 11:30 AM | Bid Submission End Date | 2025-01-09 11:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 60 |
Tender Fee | ₹ 1655 |
EMD (Earnest Money Deposit) | ₹ 18,719 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - General Kip Lb Rectification Urgent&#x0d Rectification Of Kulakkada Branch Canal From&#x0d Ch 16400m To 16700m In Kottarakka Constituency General Civil Work&#x0d
The Irrigation Department, a State Government authority, invites open tenders (Tender ID: 2024_Irrig_718370_2, Reference No: IRR/PII/TR/5543/2022_5_12_10/1) for the urgent rectification of the Kulakkada Branch Canal (Ch 16400m to 16700m, Kottarakka Constituency). This general civil work, valued at ₹7,48,762, requires rectification of the GENERAL KIP LB. The tender, issued by the Assistant Executive Engineer, KIP LB Subdivision No 13 Kollam, demands a fixed EMD of ₹18,719 and a tender fee of ₹1,655, payable online. Bid submission (online) commences January 1st, 2025, 5:00 PM and concludes January 9th, 2025, 5:00 PM. Bid opening is scheduled for January 13th, 2025, 11:00 AM at KIP LB Subdivision No 13 Kollam. The project timeframe is 365 days, and the bid validity is 60 days. Interested parties should refer to the tender documents for detailed specifications and submission requirements.
Get Hassle free financing for your business
Office Inviting Bids | Assistant Executive Engineer |
Address | Assistant Executive Engineer Kip Lb Subdivision No 13 Kollam |
Contact Details | NA |
NA | |
Website | NA |
General Kip Lb Rectification Arresting
 Leakage Of Kulakkada Branch Canal Flume..read more
General Kip Lb Rectification Arresting
 Leakage Of Syphon Well At Ch..read more
General-kip(lb)-rectification Work In The
 Pallimon Distributary In Between Ch.0 To 200m
..read more
General Kip Rb Urgent Rectification
 Works To Arrest Heavy Seepage In..read more
General Urgent Rectification Work Dw Muttakadu Kovalam Road Ch 0/500 To..read more
All the major brands in each raw material category