Construction Of Shahad Railway Over Bridge On Central Railway Line Under Extd Muip
Tender Title | Construction Of Shahad Railway Over Bridge On Central Railway Line Under Extd Muip | ||
Tender ID | 2024_MMRDA_1117073_1 | Tender Reference Number | ED/ExtdMUIP/ROB/2024 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-20 09:30 AM | Tender Closing Date | 2025-02-10 05:30 AM |
Tender Value | Refer Document | Tender Location | Shahad Railway Station , Thane , Maharashtra |
Tender Category | Works | Product Category | Bridge Construction Tenders, Civil And Architectural Services Tenders, Civil And Construction Tenders, Civil Works Others Tenders |
ePublished Date | 2024-10-15 09:25 AM | Bid Opening Date | 2025-02-12 09:30 AM |
Document Download Start Date | 2025-01-20 09:30 AM | Document Download End Date | 2025-02-10 05:30 AM |
Bid Submission Start Date | 2025-01-20 09:30 AM | Bid Submission End Date | 2025-02-10 05:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 180 |
Tender Fee | ₹ 100500 |
EMD (Earnest Money Deposit) | ₹ 9,87,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Construction Of Shahad Railway Over Bridge On Central Railway Line Under Extd Muip
The Mumbai Metropolitan Region Development Authority (MMRDA) invites open tenders for the construction of the Shahad Railway Over Bridge on the central railway line, under the Extended Mumbai Urban Infrastructure Project (Extd MUIP). This lump-sum contract (Tender ID: 2024_MMRDA_1117073_1, Tender Reference Number: ED/ExtdMUIP/ROB/2024) requires three covers: Fee, PreQual/Technical, and Finance, with a tender fee of ₹100,500 and an EMD of ₹987,000. The bid submission period begins January 20th, 2025, at 3:00 PM and concludes February 10th, 2025, at 11:00 AM. Bid opening is scheduled for February 12th, 2025, at 3:00 PM at MMRDA BKC. The Superintending Engineer at MMRDA new building, 5th floor, BKC Bandra is the tender inviting authority. Interested parties should review tender documents available for download between January 20th and February 10th, 2025. The project involves a 730-day construction period and is located at Shahad railway station. A pre-bid meeting will be held on January 30th, 2025, at 3:00 PM at the MMRDA new building, 5th floor, BKC Bandra.
Get Hassle free financing for your business
Office Inviting Bids | Supreintending Engineer |
Address | Mmrda New Building 5th Floor Bkc Bnadra |
Contact Details | NA |
NA | |
Website | NA |
Construction Of Shahad Railway Over Bridge On Central Railway Line Under..read more
Construction Of Railway Over Bridge/railway Under Bridge With Service Road Gangakhed..read more
Structural Design And Drawings For Proposed Construction Of New 23 Robs,..read more
Provision Of Escalators On Railway Platforms Under Abss Scheme Over Mumbai..read more
Redevelopment Of Thiruvananthapuram Central Railway Station South Terminal Block - Mlcp..read more
All the major brands in each raw material category