Ballastless Trackwork In Mainline From Pob At Bhakti Park To Mulund Fire Station Including Siding Tracks At Pob Of Bhakti Park Station And Pocket Track Between Sonapur And Mulund Fire Station Of Line 4
Tender Title | Ballastless Trackwork In Mainline From Pob At Bhakti Park To Mulund Fire Station Including Siding Tracks At Pob Of Bhakti Park Station And Pocket Track Between Sonapur And Mulund Fire Station Of Line 4 | ||
Tender ID | 2024_MMRDA_1074391_1 | Tender Reference Number | MMRDA/4/MMRP/CA-168 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-09-06 12:30 PM | Tender Closing Date | 2024-09-19 09:30 AM |
Tender Value | ₹ 223.78 Cr | Tender Location | Mumbai , Mumbai Subueban , Maharashtra |
Tender Category | Works | Product Category | Civil And Construction Tenders, Road Construction Tenders |
ePublished Date | 2024-08-23 07:30 AM | Bid Opening Date | 2024-09-20 09:45 AM |
Document Download Start Date | 2024-08-23 07:30 AM | Document Download End Date | 2024-09-19 09:30 AM |
Bid Submission Start Date | 2024-09-06 12:30 PM | Bid Submission End Date | 2024-09-19 09:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 180 |
Tender Fee | ₹ 12300 |
EMD (Earnest Money Deposit) | ₹ 1,00,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Ballastless Trackwork In Mainline From Pob At Bhakti Park To Mulund Fire Station Including Siding Tracks At Pob Of Bhakti Park Station And Pocket Track Between Sonapur And Mulund Fire Station Of Line 4
The Mumbai Metropolitan Region Development Authority (MMRDA) invites bids for the construction of "BALLASTLESS TRACKWORK IN MAINLINE FROM POB AT BHAKTI PARK to MULUND FIRE STATION INCLUDING SIDING TRACKS AT POB OF BHAKTI PARK STATION AND POCKET TRACK BETWEEN SONAPUR AND MULUND FIRE STATION OF LINE 4." This open tender, with a total estimated value of ₹2,23,77,73,705, requires a fixed EMD of ₹1,00,000. The tender documents can be downloaded from August 23, 2024, and bids must be submitted by 3:00 PM on September 19, 2024. The bid opening will be held at MMRDA BKC on September 20, 2024, at 3:15 PM. The project involves the construction of ballastless trackwork, a crucial component of the Mumbai Metro Line 4. This tender presents a significant opportunity for contractors specializing in civil works, particularly in the BLT track sector, to contribute to the expansion of Mumbai's metro network.
Office Inviting Bids | Director Works |
Address | 7th Floor New Mmrda Building Bkc |
Contact Details | NA |
NA | |
Website | NA |
Replacement Of Signalling Gears In Connection With Disamantling Of Existing Tracks And Relaying Of New Tracks In Iocl Siding At..read more
Design, Supply, Installation, Testing And Commissioning Of Ballastless, Ballasted Track, Fastening System And Turnouts In Corridor 2 From Benniganahalli To..read more
Design, Supply, Installation, Testing And Commissioning Of Ballastless, Ballasted Track, Fastening System And Turnouts In Corridor 2 From Benniganahalli To..read more
Signalling Arrangements In Connection With Provision Of Track Machine Siding At Tir Station Under Sse/s/tir Section...read more