Work Of Cons Of Tw Plj Of Rising Main Pipelines Internal Village Distribution Pipeline Reservoir And Fhtc In Jjm Village Mancha Under Ps Kishangarhbas
Tender Title | Work Of Cons Of Tw Plj Of Rising Main Pipelines Internal Village Distribution Pipeline Reservoir And Fhtc In Jjm Village Mancha Under Ps Kishangarhbas | ||
Tender ID | 2024_PHCJA_437679_1 | Tender Reference Number | ACE/NCR/ALW/04/2024-25 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-12-19 04:00 AM | Tender Closing Date | 2025-01-15 11:30 AM |
Tender Value | ₹ 2.86 Cr | Tender Location | Kishangarhbas , Alwar , Rajasthan |
Tender Category | Works | Product Category | Civil Works Others Tenders, Water Storage And Supply Tenders, Pipe Line Project Tenders |
ePublished Date | 2024-12-19 04:00 AM | Bid Opening Date | 2025-01-16 05:30 AM |
Document Download Start Date | 2024-12-19 04:00 AM | Document Download End Date | 2025-01-15 11:30 AM |
Bid Submission Start Date | 2024-12-19 04:00 AM | Bid Submission End Date | 2025-01-15 11:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 7000 |
EMD (Earnest Money Deposit) | ₹ 5,71,380 |
EMD Fee Type | Percentage |
Payment Instruments/Mode | Offline |
Work Description - Work Of Cons Of Tw Plj Of Rising Main Pipelines Internal Village Distribution Pipeline Reservoir And Fhtc In Jjm Village Mancha Under Ps Kishangarhbas
The Public Health Engineering Department (PHED), Chief Engineer (HQ), Jaipur, invites bids for an open tender (Tender ID: 2024_PHCJA_437679_1, Reference Number: ACE/NCR/ALW/04/2024-25) for the construction of a water supply system in JJM Village Mancha, Kishangarhbas. This ₹2,85,69,000 project involves the construction of transmission pipelines, village distribution pipelines, a reservoir, and a FHTC (likely a Fluoride and Heavy Metal Treatment Facility). The tender documents are available for download from December 19th, 2024, 09:30 AM to January 15th, 2025, 05:00 PM. Bids must be submitted by January 15th, 2025, 05:00 PM, with opening scheduled for January 16th, 2025, 11:00 AM at ACE NCR Region Alwar. A 2% EMD of ₹5,71,380 is required, payable to EE PHED Division Bhiwadi NCR. The tender fee is ₹7,000. The project duration is 270 days, and the bid validity is 90 days. Interested bidders should carefully review the tender documents available on the PHED website to comply with all submission requirements.
Get Hassle free financing for your business
Office Inviting Bids | Ace Ncr Region Alwar |
Address | Ace Ncr Region Alwar |
Contact Details | NA |
NA | |
Website | NA |
Work Of Cons Of Tw Plj Of Rising Main Pipelines Internal..read more
Work Of Construction Of Source, Plj Of Rising Main Pipelines, Internal..read more
Work Of Construction Of Source, Plj Of Rising Main Pipelines, Internal..read more
Work Of Construction Of Source, Plj Of Rising Main Pipelines, Internal..read more
Work Of Construction Of Source, Plj Of Rising Main Pipelines, Internal..read more
All the major brands in each raw material category