Balance Of System Package For Development Of 1400 Mw Grid Connected Solar Pv Projects In Lalitpur (2x300mw) And Chitrakoot (2x400mw) In Uttar Pradesh
Tender Title | Balance Of System Package For Development Of 1400 Mw Grid Connected Solar Pv Projects In Lalitpur (2x300mw) And Chitrakoot (2x400mw) In Uttar Pradesh | ||
Tender ID | NA | Tender Reference Number | NRE-CS-5822-004(BOS)-9 |
Tender Type | Open/advertised | ||
Tender Opening Date | 2024-12-23 04:30 AM | Tender Closing Date | 2025-01-30 09:30 AM |
Tender Value | Refer Document | Tender Location | Renewable Energy , Gautam Buddha Nagar , Uttar Pradesh |
Tender Category | Services | Product Category | Solar Installation and Products Tenders, Energy Oil and Gas Tenders |
ePublished Date | 2024-12-23 11:21 AM | Bid Opening Date | 2025-01-30 10:00 AM |
Document Download Start Date | 2025-01-03 04:30 AM | Document Download End Date | 2025-01-13 11:30 AM |
Bid Submission Start Date | 2024-12-23 04:30 AM | Bid Submission End Date | 2025-01-30 09:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | NA |
Tender Fee | Refer document |
EMD (Earnest Money Deposit) | Refer document |
EMD Fee Type | NA |
Payment Instruments/Mode | NA |
Work Description - Balance Of System Package For Development Of 1400 Mw Grid Connected Solar Pv Projects In Lalitpur (2x300mw) And Chitrakoot (2x400mw) In Uttar Pradesh
NTPC Limited, a Public Sector Undertaking, invites bids for the "BALANCE OF SYSTEM PACKAGE FOR DEVELOPMENT OF 1400 MW GRID CONNECTED SOLAR PV PROJECTS IN LALITPUR (2X300MW) AND CHITRAKOOT (2X400MW) IN UTTAR PRADESH" (Tender Reference Number: NRE-CS-5822-004(BOS)-9). This open tender, categorized as a service procurement for electrical goods/equipment, requires submission by 3:00 PM on January 30th, 2025, with bid opening scheduled for 3:30 PM the same day. Tender documents are available for download between January 3rd and 13th, 2025. There is no tender fee or earnest money deposit required. Interested parties should contact the Sr. Manager at NTPC Renewable Energy Limited, 4th Floor, Renewable Building, Plot No. 3E, Ecotech-II, Udyog Vihar, Greater Noida, Dist. Gautam Budh Nagar-201301 (U.P.) for further information.
Get Hassle free financing for your business
Office Inviting Bids | Sr. Manager |
Address | Ntpc Renewable Energy Limited, 4th Floor, Renewable Building, Plot No. 3e, Ecotech-ii, Udyog Vihar, Greater Noida, Dist. Gautam Budh Nagar-201301 (u.p.) |
Contact Details | NA |
NA | |
Website | NA |
Balance Of System Package For Development Of 1500mw Grid Connected Solar..read more
Balance Of System (bos) Package For Development Of 1200mw (4x300mw Blocks)ists..read more
Balance Of System (bos) Package For Development Of 1200mw (4x300mw Blocks)ists..read more
300 Mw Epc Package With Land For Development Of Ists Connected..read more
300 Mw Epc Package With Land For Development Of Ists Connected..read more
All the major brands in each raw material category