Ro Majhauli Maurya Basti Link Road Km 1(350)
Tender Title | Ro Majhauli Maurya Basti Link Road Km 1(350) | ||
Tender ID | 2025_CEUVZ_994531_31 | Tender Reference Number | 16/4A date 04-01-2025 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-23 03:30 AM | Tender Closing Date | 2025-01-31 06:30 AM |
Tender Value | Refer Document | Tender Location | Jaunpur , Jaunpur , Uttar Pradesh |
Tender Category | Works | Product Category | Road Construction Tenders |
ePublished Date | 2025-01-23 03:30 AM | Bid Opening Date | 2025-01-31 07:00 AM |
Document Download Start Date | 2025-01-23 03:30 AM | Document Download End Date | 2025-01-31 06:30 AM |
Bid Submission Start Date | 2025-01-23 03:30 AM | Bid Submission End Date | 2025-01-31 06:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 944 |
EMD (Earnest Money Deposit) | ₹ 34,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Ro Majhauli Maurya Basti Link Road Km 1(350)
The Chief Engineer PWD Varanasi Zone invites open tenders for the construction of the RO Majhauli Maurya basti link road, km 1(350), in Jaunpur. This open tender (Tender ID: 2025_CEUVZ_994531_31, Reference Number: 16/4A dated 04-01-2025) is a fixed-rate contract with a tender fee of ₹944 and an EMD of ₹34,000 (EMD through BG/ST or exemption allowed). Tender documents are available for download from January 23rd, 2025, 9:00 AM to January 31st, 2025, 12:00 PM. Bids must be submitted online by January 31st, 2025, 12:00 PM, with opening scheduled for 12:30 PM on the same day at the E.E. Construction Division-2, P.W.D. Jaunpur (Address: E.E. Construction Division-2, P.W.D. Jaunpur, Pincode: 222002). The project involves civil works and has a 60-day work period and 90-day bid validity. Withdrawal of bids is allowed. Interested bidders should refer to the tender documents for details on pre-qualification and technical evaluation.
Get Hassle free financing for your business
Office Inviting Bids | E.e. Construction Division-2, P.w.d. Jaunpur |
Address | E.e. Construction Division-2, P.w.d. Jaunpur |
Contact Details | NA |
NA | |
Website | NA |
Ro Nayansand Maurya Basti Link Road Km 1(200)..read more
Ro Bindrawan Anusuchit Basti Link Road Km 1(350)..read more
Ro Nayansand Anusuchit Basti Link Road Km 1(350)..read more
Ro Narkata Fok Thakuran Basti Link Road Km. 1(350)..read more
Ro Sirkoni Gadhar Road To Maurya Basti Link Road Km 1(800)..read more
All the major brands in each raw material category