Renewal Of Mathiya Link Road
Tender Title | Renewal Of Mathiya Link Road | ||
Tender ID | 2025_CEUFZ_998313_69 | Tender Reference Number | 40/Nivida-9A Dated 15-01-2025 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-27 07:00 AM | Tender Closing Date | 2025-02-10 07:00 AM |
Tender Value | ₹ 21.31 L | Tender Location | Ee Cd Pwd Ambedkarnagar , Kheri , Uttar Pradesh |
Tender Category | Works | Product Category | Road Construction Tenders |
ePublished Date | 2025-01-27 07:00 AM | Bid Opening Date | 2025-02-10 07:30 AM |
Document Download Start Date | 2025-01-27 07:00 AM | Document Download End Date | 2025-02-10 07:00 AM |
Bid Submission Start Date | 2025-01-27 07:00 AM | Bid Submission End Date | 2025-02-10 07:00 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 944 |
EMD (Earnest Money Deposit) | ₹ 2,14,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Renewal Of Mathiya Link Road
The Chief Engineer PWD Faizabad Zone invites open tenders for the renewal of the Mathiya link road (Tender ID: 2025_CEUFZ_998313_69, Tender Reference Number: 40/Nivida-9A Dated 15-01-2025). This ₹21,31,000 fixed-rate contract requires a ₹944 tender fee and a ₹2,14,000 EMD (Earnest Money Deposit), with EMD exemption allowed. The tender documents are available for download from January 27th, 2025, 12:30 PM to February 10th, 2025, 12:30 PM. Bids must be submitted online by February 10th, 2025, 12:30 PM, with opening scheduled for 1:00 PM the same day at EE CD PWD Ambedkarnagar (Address: EE CD PWD Ambedkarnagar, Pincode: 224122). A pre-bid meeting is scheduled for February 7th, 2025, at 12:00 PM at the same location. The work period is 60 days, and the bid validity is 90 days. Interested bidders should refer to the tender documents for details on pre-qualification and NDA requirements.
Get Hassle free financing for your business
Office Inviting Bids | Ee Cd Pwd Ambedkarnagar |
Address | Ee Cd Pwd Ambedkarnagar |
Contact Details | NA |
NA | |
Website | NA |
Tirasada Mathiya Link Road..read more
Bilari Mathiya Tola Link Road Length2.1 Km..read more
Construction Of Chakjeevan Urf Mathiya Link Road From Banuadih Pitch Road..read more
Renewal Of Mathiya Iddu Nawabighat To Rajapur Khas Road Lot 128..read more
Thekama Rajawaha Inawal Nahar Ki Patari To Keshaw Bharati Mathiya Link..read more
All the major brands in each raw material category