Renewal Work With General Repair Of Bilari Mathiya Tola Link Road Length2.1 Km
Tender Title | Renewal Work With General Repair Of Bilari Mathiya Tola Link Road Length2.1 Km | ||
Tender ID | 2025_CEGKP_1014122_4 | Tender Reference Number | 551/1A Dated 05-03-2025 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-03-07 06:30 AM | Tender Closing Date | 2025-03-18 06:30 AM |
Tender Value | ₹ 29 L | Tender Location | Gorakhpur , Gorakhpur , Uttar Pradesh |
Tender Category | Works | Product Category | Road Construction Tenders, Civil Works Others Tenders |
ePublished Date | 2025-03-07 06:30 AM | Bid Opening Date | 2025-03-18 07:00 AM |
Document Download Start Date | 2025-03-07 06:30 AM | Document Download End Date | 2025-03-18 06:30 AM |
Bid Submission Start Date | 2025-03-07 06:30 AM | Bid Submission End Date | 2025-03-18 06:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 944 |
EMD (Earnest Money Deposit) | ₹ 2,90,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Renewal Work With General Repair Of Bilari Mathiya Tola Link Road Length2.1 Km
The Chief Engineer Gorakhpur Zone PWD Gorakhpur UP invites open tenders (Tender ID: 2025_CEGKP_1014122_4, Reference No: 551/1A Dated 05-03-2025) for the renewal and general repair of the Bilari mathiya tola link road (2.1 km). The tender, valued at ₹29,00,000, requires a ₹2,90,000 EMD and a ₹944 tender fee. Documents are available for download from March 7th, 2025, 12:00 PM to March 18th, 2025, 12:00 PM, with bids due by March 18th, 2025, 12:00 PM and opening at 12:30 PM on the same day at CD 2 PWD GORAKHPUR. The contract is a percentage-based agreement with a 60-day work period and a 90-day bid validity. Withdrawal of bids is allowed. Interested parties should contact the Executive Engineer, CD 2 PWD GORAKHPUR for further information.
Get Hassle free financing for your business
Office Inviting Bids | Executive Engineer |
Address | Cd 2 Pwd Gorakhpur |
Contact Details | NA |
NA | |
Website | NA |
Renewal Work Of Mathiya Link Road..read more
Renewal Work With General Repair Of Shinhorwa Link Road Lot 2..read more
Renewal Work With General Repair Of Km-14 Lehdari Manikpur To Kunbiyan..read more
Renewal Work With General Repair Of Saini Canal Km-5 To Sambhui..read more
Renewal Work With General Repair Of Masipur Link Road..read more
All the major brands in each raw material category