Jungle Clearance And Silt Removal Between Km 0.000 To 3.420 Of Fatpurwa Mr. (lot 19)
Tender Title | Jungle Clearance And Silt Removal Between Km 0.000 To 3.420 Of Fatpurwa Mr. (lot 19) | ||
Tender ID | 2024_UPIDC_962468_2 | Tender Reference Number | 04/AE-III/2024-25 |
Tender Type | Open Tender | ||
Tender Opening Date | 2024-10-15 03:30 AM | Tender Closing Date | 2024-10-21 07:30 AM |
Tender Value | ₹ 67 K | Tender Location | Banda , Banda , Uttar Pradesh |
Tender Category | Works | Product Category | Civil Works Others Tenders, Environmental Service Tenders |
ePublished Date | 2024-10-15 03:30 AM | Bid Opening Date | 2024-10-21 08:30 AM |
Document Download Start Date | 2024-10-15 03:30 AM | Document Download End Date | 2024-10-21 07:30 AM |
Bid Submission Start Date | 2024-10-15 03:30 AM | Bid Submission End Date | 2024-10-21 07:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 559 |
EMD (Earnest Money Deposit) | ₹ 1,340 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Jungle Clearance And Silt Removal Between Km 0.000 To 3.420 Of Fatpurwa Mr. (lot-19)
The U P Irrigation Department (Civil), Assistant Engineer, Ken Canal Division Banda, invites open tenders (Tender ID: 2024_UPIDC_962468_2, Ref No: 04/AE-III/2024-25) for Jungle Clearance and Silt Removal between km 0.000 to 3.420 of Fatpurwa Mr. (LOT-19) in Banda. This civil works contract, valued at ₹67,000, requires a fixed EMD of ₹1340 and a tender fee of ₹559. Documents are available for download from October 15th, 2024, 09:00 AM to October 21st, 2024, 01:00 PM. Bids must be submitted online by October 21st, 2024, 01:00 PM, with opening scheduled for 2:00 PM the same day. The work period is 15 days, and the bid validity is 90 days. Interested parties should refer to the tender documents for pre-qualification details and submit their bids electronically.
Get Hassle free financing for your business
Office Inviting Bids | Assistant Engineer |
Address | Assistant Engineer, Ken Canal Division Banda |
Contact Details | NA |
NA | |
Website | NA |
Jungle Clearance And Silt Removal Between Km 0.000 To 3.820 Of..read more
Jungle Clearance And Silt Removal Between Km 0.000 To 2.810 Of..read more
Estimate For Jungle Clearance And Silt Removal Between Km 0.000 To..read more
Jungle Clearance, Bed And Berm Scraping And Silt Removal Between Km..read more
Jungle Clearance, Bed And Berm Scraping And Silt Removal Between Km..read more
All the major brands in each raw material category