Gateway Configuration Of Alstom Make Scada System
Tender Title | Gateway Configuration Of Alstom Make Scada System | ||
Tender ID | 2025_UPTCL_1001931_1 | Tender Reference Number | 17/ETD(O)/2024-25 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-02-04 10:30 AM | Tender Closing Date | 2025-02-18 05:30 AM |
Tender Value | Refer Document | Tender Location | 132 Kv Substation Konch , Jalaun , Uttar Pradesh |
Tender Category | Works | Product Category | Electrical Goods and Equipments Tenders, Software and IT Solutions Tenders |
ePublished Date | 2025-02-04 10:30 AM | Bid Opening Date | 2025-02-18 08:00 AM |
Document Download Start Date | 2025-02-04 10:30 AM | Document Download End Date | 2025-02-18 05:30 AM |
Bid Submission Start Date | 2025-02-04 10:30 AM | Bid Submission End Date | 2025-02-18 05:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 590 |
EMD (Earnest Money Deposit) | ₹ 4,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Offline |
Work Description - Gateway Configuration Of Alstom Make Scada System Installed At 132 Kv Substation Konch
The UP Power Transmission Corp. Ltd (Operation) invites open tenders for the gateway configuration of an ALSTOM SCADA system at the 132 KV Konch substation. The tender (Reference No: 17/ETD(O)/2024-25, ID: 2025_UPTCL_1001931_1), issued by the Executive Engineer, Electy. Transmission Division, 220 KV Substation Orai, requires a fixed-rate contract for this electrical works project. The tender documents are available for download from February 4th, 2025, 4:00 PM to February 18th, 2025, 11:00 AM, with bids due by the latter time. Bid opening is scheduled for February 18th, 2025, at 1:30 PM at ETD ORAI. A non-refundable tender fee of ₹590 and an EMD of ₹4000 are payable to the Executive Engineer at ETD ORAI. The project, estimated to take 15 days, necessitates two covers: one for technical and fee information, and one for the Bill of Quantities (BOQ). Interested parties should refer to the tender documents for detailed specifications and NDA requirements.
Get Hassle free financing for your business
Office Inviting Bids | Executive Engineer |
Address | Electy. Transmission Division 220 Kv Substation Orai |
Contact Details | NA |
NA | |
Website | NA |
Configuration Of Ziv Make Scada System Installed At 132 Kv Sub..read more
Configuration Of Abb Make Scada System Installed At 132 Kv Sub-station..read more
Work Of Scada Integration And Configuration Of Rtu At 132 Kv..read more
Repairing And Restoration Work Of Scada Hmi And Configuration Scoda System..read more
Upgradation Of Scada System In Connection With Provision Of Cyber Security..read more
All the major brands in each raw material category