02/pmksy Wdc 2.0/08/ Puncha Nrm/2024 25
Tender Title | 02/pmksy Wdc 2.0/08/ Puncha Nrm/2024 25 | ||
Tender ID | 2025_DOA_815849_41 | Tender Reference Number | 02/PMKSY-WDC 2.0/08/ PUNCHA-NRM/2024-25 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-02-14 03:30 AM | Tender Closing Date | 2025-03-03 12:30 PM |
Tender Value | ₹ 6.17 L | Tender Location | As Per Nit , Puruliya , West Bengal |
Tender Category | Works | Product Category | Civil Works Others Tenders, Water Storage And Supply Tenders |
ePublished Date | 2025-02-14 03:30 AM | Bid Opening Date | 2025-03-04 07:30 AM |
Document Download Start Date | 2025-02-14 03:30 AM | Document Download End Date | 2025-03-03 12:30 PM |
Bid Submission Start Date | 2025-02-14 03:30 AM | Bid Submission End Date | 2025-03-03 12:30 PM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 180 |
Tender Fee | Refer document |
EMD (Earnest Money Deposit) | ₹ 12,342 |
EMD Fee Type | Percentage |
Payment Instruments/Mode | Online |
Work Description - Construction Of Dug Well
The Directorate of Agriculture, Puncha Block, Purulia, invites open tenders for the construction of a dug well (Tender ID: 2025_DOA_815849_41; Tender Reference Number: 02/PMKSY-WDC 2.0/08/ PUNCHA-NRM/2024-25). The project, valued at ₹6,17,114, requires a 2% EMD of ₹12,342 and has a 30-day work period and 180-day bid validity. Tender documents are available for download from February 14th, 2025, 9:00 AM to March 3rd, 2025, 6:00 PM. Bids must be submitted online by March 3rd, 2025, 6:00 PM, with opening scheduled for March 4th, 2025, 1:00 PM at the ADA, Puncha Block, Purulia. The tender is a percentage-based contract with online payment. Interested parties should contact the Assistant Director of Agriculture, Puncha Block, Purulia, for further details. Withdrawal of bids is allowed.
Get Hassle free financing for your business
Office Inviting Bids | Assistant Director Of Agriculture , Puncha Block |
Address | Puncha Block Purulia |
Contact Details | NA |
NA | |
Website | NA |
Construction Of Dug Well..read more
Construction Of Dug Well..read more
Re-excavation Of Pond Bhuta Bundh At Kuruktopa Mouza, Jl No L3,..read more
Re-excavation Of Pond Ban Bundh At Deorang Mouza, Jl No L..read more
Construction Of Open Well (4) Under Pmksy 2.0 Wdc-2/2021-22 P.s. Khairabad..read more
All the major brands in each raw material category