Wbphed/ee/md/niet 49 Of 2024 2025, Sl. No. 18
Tender Title | Wbphed/ee/md/niet 49 Of 2024 2025, Sl. No. 18 | ||
Tender ID | 2025_PHED_801221_18 | Tender Reference Number | WBPHED/EE/MD/NIeT_49 of 2024-2025 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-01-18 07:40 AM | Tender Closing Date | 2025-02-21 11:30 AM |
Tender Value | ₹ 52.26 L | Tender Location | Doulatpur Phe Complex, Maliha Malda-732102 , Malda , West Bengal |
Tender Category | Works | Product Category | Water Storage And Supply Tenders, Civil Works Others Tenders, Irrigation Work Tenders |
ePublished Date | 2025-01-18 07:40 AM | Bid Opening Date | 2025-02-24 05:30 AM |
Document Download Start Date | 2025-01-18 07:40 AM | Document Download End Date | 2025-02-21 11:30 AM |
Bid Submission Start Date | 2025-01-18 07:40 AM | Bid Submission End Date | 2025-02-21 11:30 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 270 |
Tender Fee | Refer document |
EMD (Earnest Money Deposit) | ₹ 1,04,530 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Sinking Of Tube Well, Providing Fhtc, Construction Of Pump House Boundary Wall At Matiharpur Piped Water Supply Scheme At Chanchal-i Dev. Block Under Malda Division, Phe Dte. Govt. Of West Bengal.
The Executive Engineer, Malda Division, PHED, invites open tenders (Tender ID: 2025_PHED_801221_18, Reference No: WBPHED/EE/MD/NIeT_49 of 2024-2025) for the sinking of a tube well, provision of FHTC, and construction of a pump house boundary wall at the Matiharpur Piped Water Supply Scheme in Chanchal-I Development Block, Malda Division, under the PHE Directorate, Government of West Bengal. The estimated project cost is ₹52,26,271, with a fixed EMD of ₹1,04,530 (EMD exemption allowed). Documents are available for download from January 18th, 2025, to February 21st, 2025, 5:00 PM. Bids must be submitted online by February 21st, 2025, 5:00 PM, and will be opened on February 24th, 2025, at 11:00 AM at the DOULATPUR PHE COMPLEX, MALIHA MALDA-732102. The contract is a percentage-based work contract with a 45-day work period and 270-day bid validity. Interested parties should refer to the tender documents for detailed specifications and submission procedures.
Get Hassle free financing for your business
Office Inviting Bids | The Executive Engineer, Malda Division, Phed |
Address | Doulatpur Phe Complex, Maliha Malda-732102 |
Contact Details | NA |
NA | |
Website | NA |
Replacement Of 200 Mm Dia. All Through Tube Well At Head..read more
Rectification Of Repair Of Existing Fhtc Connection For Basara Piped Water..read more
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run..read more
Rectification Of Repair Of Existing Fhtc Connection For Gun Sankrul Piped..read more
Emergent Repair Of Pipe Line Of Distribution System Damaged By Wbsedcl..read more
All the major brands in each raw material category